Serving as a client representative with regulatory agencies
Drilling activities to collect soil samples and install monitoring wells. This Risk Assessment project was performed to determine the lateral and vertical extents of impacted soil and groundwater. All activities were conducted according to applicable regulations, including soil and groundwater sampling and decontamination procedures.
Decontamination equipment. All equipment introduced into the subsurface is decontaminated to prevent cross contamination between samples and produce accurate results.
Drilling location after completion of activities. The area was cleaned without disruption to regular site operations.
For questions or comments about this site, please email us at
info@hkcenv.com.